新疆时时彩开奖号码-重庆时时彩万能投注

譯名堂畢業翻譯研討

2022級“譯名堂”畢業翻譯研討第28場

發布日期:2024年12月31日      作者:李紅程      編輯:唐敏      審核:余鴻      點擊:[]


內容簡介:

《施工方法說明》(水電工程)全書共12個章節,總字數為48600字,共十二節內容,其主要內容是介紹公司為取得工程項目所做出的施工方案說明,譯者翻譯的第七章,共計15576。譯者翻譯的部分主要是關于排水閘和泄洪閘的施工介紹說明,其中介紹了工程概況、施工部署及進度計劃安排、為順利施工做的一系列準備以及主要施工方法。工程概況介紹了施工主體的結構設計特點、施工條件及施工難點,是對一個工程項目全面而簡潔描述,為施工參與人員和讀者提供一個關于項目基本情況和主要特點的概覽。

二、譯文修改:

1

ST:先深后淺,先中部后兩邊,先底部后上部,先閘室、消力池后鋪蓋、護坦。井點降水、閘塘開挖同時進行。

TT1:From the deep foundation to the shallow one; middle part first and both sides then; from the bottom part to the upper part; gate clamber and stilling basin first and the apron then, and well point dewatering and sluice pond excavation shall be operated simultaneously.

TT2: From the deep foundation to the shallow one; from the central area to the sides; from the bottom part to the top; gate clamber and stilling basin first and followed by the apron. Well point dewatering and sluice pond excavation shall be carried out simultaneously.

2

ST為了防止模板走動變形,在閘室內搭設滿堂腳手支撐,縱橫鋼管間距為1m左右,同時也準確控制閘室的尺寸,閘室墻墩的模板以扣件、鋼管依付于閘室內滿堂腳手支撐固定,墻墩厚度以止水對銷螺栓控制。

TT1: To prevent the deformation of the formworks, and control the size of the gate chamber, a scaffolding with full framing shall be set up in the gate chamber. The spacing of vertical and horizontal steel pipes is about 1m. The formworks for the gate chamber wall piers shall be fixed with fasteners and steel pipes attached to the scaffolding inside the gate chamber, and the thickness of the wall pier is controlled by the sealing counter bolt.

TT2To prevent the deformation of the formwork, a scaffolding with full framing shall be set up in the gate chamber, the spacing of vertical and horizontal steel pipes is about 1m. And to control the size of the gate chamber, the formworks for the gate chamber wall piers shall be fixed with fasteners and steel pipes attached to the scaffolding inside the gate chamber, and the thickness of the wall pier is controlled by the sealing counter bolt.

3

ST為確保墩墻的厚度,按每層橫圍檁的位置布置對拉止水螺栓,對拉止水螺栓水平距離60厘米左右。螺栓的長度按壁的厚度加墻筋的厚度加鋼管橫圍檁的直徑加鋼墊片的厚度加螺帽的厚度再加每邊不少于2厘米確定。螺栓的直徑可選用ф14~16普園鋼筋

TT1: In order to ensure the thickness of the pier wall, split sealing bolts shall be arranged according to the position of each layer of the horizontal steel pipe purlin with a horizontal distance of about 60 centimeters. The length of the bolt is determined by the thickness of the pier wall, reinforcement, the steel gasket, the screw nut, and the diameter of the steel pipe purlin and not less than 2cm on each side. The bolt of universal steel bar can be ф1416 in diameter.

TT2: In order to ensure the thickness of the pier wall, split sealing bolts shall be arranged according to the position of each layer of the horizontal steel pipe purlin with a horizontal distance of about 60 centimeters. The length of the bolt is determined by adding the thickness of reinforcement plus the thickness of the steel gasket, plus the thickness of the screw nut, and the diameter of the steel pipe purlin, plus not less than 2 cm on each side. The bolt of universal steel bar can be ф1416 in diameter.

三、研討反思:

通過此次研討我學習到對于科技文本的翻譯,更應該注意用詞的準確性和規范性,詞匯的翻譯是最基本的翻譯,如果專業術語出現錯誤,譯文的意思就會與源文本截然不同。對于譯文信息重復的地方翻譯前應先梳理漢語,通過合并、重塑、簡化或使用指示代詞等方式,在保持信息一致性的同時避免冗余。并且科技文本的翻譯應采用規范性的科學文本表達風格,避免口語話和不客觀的用詞,例如最開始譯文出現的“then” “what’s more”。此外,本人在翻譯過程中也存在對源文本理解出現偏差的情況,擅自將譯文前后并列,改變了原文意思,譯者在后續撰寫過程中將搜索較為權威的搜索引擎、學術網站,對源文本所涉及到的專業知識進行查漏補缺,同時加強審核校對,從語法正確性、拼寫標點規范、術語統一、風格連貫性等多層面細致檢查譯文,糾正初稿中的低級錯誤,優化表達生硬、邏輯不清之處,對存疑譯文反復斟酌修改。


上一條:2022級“譯名堂”畢業翻譯研討 第29場 下一條:2022級“譯名堂”畢業翻譯研討總結報告第27場

關閉

单机百家乐官网破解方法| 百家乐官网分享| 百家乐平注常赢玩法更| 麟游县| 青鹏棋牌游戏下载| 百家乐官网凯时娱乐场| 联合百家乐的玩法技巧和规则 | 昆明百家乐官网装修装潢有限公司| e世博百家乐娱乐场| 大发888登录网页游戏| 上海百家乐官网的玩法技巧和规则 | 百家乐网络真人斗地主| 百家乐赌球| 百家乐官网波音平台有假吗| 百家乐水浒传| 关于百家乐官网切入点| 百家乐侧牌器| 百家乐官网龙虎斗等| 大发888真钱棋牌| 百家乐官网赌博筹码| 大发888备用网址大发娱乐城| 百家乐官网长龙技巧| 大发888投注技巧| 做生意风水知识| 得荣县| 百家乐游戏软件出售| 百家乐官网连赢的策略| 至尊百家乐娱乐| 百家乐官网连闲几率| 百家乐纯技巧打| 百家乐官网象棋赌博| 斗地主百家乐的玩法技巧和规则| 百家乐官网最佳打| tt娱乐城备用| 百家乐官网大光明影院| 网上真钱娱乐| 威尼斯人娱乐城 2013十一月九问好| 三国百家乐官网娱乐城| 沙龙百家乐官网怎申请| 亚洲顶级赌场第一品牌| 金木棉百家乐网络破解|